There is little change in the status of the Jackrabbit WWTP since the last update on 9/19.
- The plant is still operating on generator power and is able to treat 100% of the AVERAGE daily flow, but not necessarily the peak flow that occurs during rainstorms.
- 5 of the 6 treatment processes are 100% operational, with the remaining one being 67% operational.
- Contractors are disconnecting the generator and attempting to return the plant to “powerline” power.
- The building that automatically controls the treatment process has been repaired as much as possible, but is still off line. There is no definitive date when it will be repaired. While some components have been repaired or replaced, the delivery of components that have failed or will fail is subject to availability from the manufacturers.