The failed sewer line has been replaced and both ends are grouted in. The HCMUD 136 lift station is back in operation. Because of anticipated rain, it may be several days until the area around the repair is finalized. Residents are free to return to normal water use/wastewater production. Thanks for helping us out the last few days!